phone

+34 938 923 802

Industrial building for electrical equipment company

[fusion_builder_container hundred_percent=\”no\” equal_height_columns=\”no\” menu_anchor=\”\” hide_on_mobile=\”small-visibility,medium-visibility,large-visibility\” class=\”\” id=\”\ ” background_color=\”\” background_image=\”\” background_position=\”center center\” background_repeat=\”no-repeat\” fade=\”no\” background_parallax=\”none\” parallax_speed=\”0.3\ ” video_mp4=\”\” video_webm=\”\” video_ogv=\”\” video_url=\”\” video_aspect_ratio=\”16:9\” video_loop=\”yes\” video_mute=\”yes\” overlay_color= \”\” video_preview_image=\”\” border_size=\”\” border_color=\”\” border_style=\”solid\” padding_top=\”\” padding_bottom=\”\” padding_left=\”\” padding_right=\ ”\”][fusion_builder_row][fusion_builder_column type=\”1_1\” layout=\”1_1\” spacing=\”yes\” center_content=\”no\” link=\”\” target=\”_self\” min_height=\”\” hide_on_mobile=\”small-visibility,medium-visibility,large-visibility\” class=\”\” id=\”\” background_color=\”\” background_image=\”\” background_position=\ ”left top\” undefined=\”\” background_repeat=\”no-repeat\” hover_type=\”none\” border_size=\”\” border_color=\”\” border_style=\”solid\” border_position=\” all\” padding_top=\”\” padding_right=\”\” padding_bottom=\”\” padding_left=\”\” margin_top=\”0px\” margin_bottom=\”0px\” animation_type=\”\” animation_direction=\ ”left\” animation_speed=\”0.3\” animation_offset=\”\” last=\”no\”][fusion_text]

Engineering Group build the industrial ship for one leading company in the production of electrical equipment. With a plot area of 25,756.99m2, a ground floor of 15,715.46m2 and a built area of 18,409.62m2, the ship has ground floor and two levels of production with a inner social block on the ground and first floor.

The social block structure, with a grid of 6.00 x 12.00m and precast concrete production platforms (pillars and slabs) with a grid of 5.88 x 9.41m.

The general structure of the ship is metal with variable profile 500/2000 mm. formed by spans of 50 m span, with porticos every 9.41 m, alternatively the central pillar is lowered with a span of 100 m.

Part of the general structure is mixed structure, supported on precast concrete pillars.

The height of the ship of 15.00m (floor, torn off the cover) in the side facades and center of the ship, and 2 cubreres at 17.16m. – Façade and roof of sandwich panel panels and skylights 21.00m long.

The ship will be destined to production, storage and offices of the company itself.

Delivery is expected during first quarter of next 2020

October 2019

[/fusion_text][fusion_youtube id=\”https://youtu.be/ZstSLhHaSz0\” alignment=\”\” width=\”\” height=\”\” autoplay=\”true\” api_params=\” \” hide_on_mobile=\”small-visibility,medium-visibility,large-visibility\” class=\”\” /][/fusion_builder_column][/fusion_builder_row][/fusion_builder_container]